Entitlements: | General Commercial | Architect: | Weeks Turner, New City Design |
Area: | 51,000 Gross Rentable Square Feet | Structural Engineer: | Peak Engineering and Design |
Project Cost: | 15 Million USD Budgeted | Surveyor: | Coastal Survey and Mapping |
Completion: | Under Development / 2019 | Landscape Architect: | Peak Engineering and Design |
Green Level Market is a smaller, more agile and compact project we’ve worked on
Vision Mangum was approached by a commercial broker who had the land under contract and was not sure how to develop it. He wanted to dip his toe into the water of commercial development, and we were brought on as a partner to help see the project through.
Key Challenges
There were many challenges. We had to design and develop the infrastructure, bringing it from an offsite location over 3,000’ away. Timing and coordination hurdles included dealing with multiple property owners, two different municipalities. We also presold the lots prior to even recombining them, which made papering the contracts all the more complicated.
Successes
We had the lots under contract before a shovel was placed in the ground. That came from a lot of time spent designing the project in 3D so that we could create a vision that was tangible to our clients.